Bring your AI into Thunderbird with atbridge.ai — manage your mailboxes, calendars, contacts, notes, and tasks as one, from a native UI, MCP, or the CLI.



/from, /clashes, /today, /week. Deterministic answers across emails + calendars, no AI tokens spent.Open the atbridge AI Chat right inside Thunderbird, pick the AI of your choice — any provider, or a private local model — and work every mailbox at once: triage, summarise, draft and ask across all your accounts. Skills (/from, /today, /clashes) answer instantly with no AI tokens spent, and Fast Actions turn any reply into a note or an email draft in one click.


atbridge Notes is a local, AI-native markdown workspace built into Thunderbird: keep folders of .md notes in a real editor with a docked AI Chat. Use as Context hands the open note to the AI; ask it to improve or extend the note, then Save to Notes appends the reply straight back in. Everything stays on your machine.


One click on an open email or note fans it out across the suite — To Note, Extract action items → Tasks, To Calendar Event, To Contact. Fast Actions interconnect your emails, notes, tasks, calendars and contacts, so nothing needs copy-paste.


Ask Claude Desktop — or any agent that speaks MCP locally — in plain language. It reads and works your inbox through atbridge, running on your machine; your mail is never routed through our servers.
Mailboxes, calendars, and contacts — your AI gets the same read and write powers you have, not a one-way digest.
Read, send, reply, forward, search, move, delete, and tag across every account. Compose in plain text, HTML, or Markdown.
Create, update, and delete events across your calendars — with cross-calendar clash detection so your AI never double-books you.
Search, create, and update contacts across every address book Thunderbird holds — so "email Maya" just works.
The bridge runs on your machine, listening only on 127.0.0.1 — your mail is never routed through atbridge.ai's servers. A direct action runs locally in ~5 ms — faster than a cloud round-trip, with no network hop — and ~72% lighter on tokens (≈3.5× cheaper per fetch) than a cloud bridge.
Activate any LLM (large language model) provider right in the Thunderbird extension — OpenAI, Anthropic, Gemini, Mistral, Groq, OpenRouter, NVIDIA and more, or local Ollama. Pick a provider and model in the atbridge panel; your API key is encrypted on-device, sealed by your OS keychain. Or run the model locally with Ollama — private, on-machine AI.
Drive atbridge.ai from wherever you work: the atbridge panel inside Thunderbird, an IDE (Cursor, VS Code, JetBrains, Antigravity), Claude Desktop or any MCP agent, Claude Code, or the terminal — same ops everywhere.
Anything Thunderbird supports: Gmail, Outlook, iCloud, ProtonMail Bridge, FastMail, your company IMAP.
Replies are lean and text-first, so your model processes a fraction of the tokens per task — the LLM bill you already pay drops. (atbridge.ai plans & quotas are separate — see pricing.)
A CLI, JSON I/O, stable schemas, and a built-in MCP server. Drop it into your scripts or agent framework in one command.
The developer surfaces and topic deep-dives each have their own page.
Drive atbridge.ai from your IDE (Cursor, VS Code), Claude Code, and the command line — the same ops everywhere.
Learn more →Connect Claude Desktop, Cursor, or any MCP agent to every mailbox, calendar, and contact.
Learn more →Turn any AI message into a fully-styled, on-brand HTML email — charts included, review before send.
Learn more →A local, AI-native markdown workspace built into Thunderbird, with a docked AI Chat.
Learn more →
Forever — no card required
Excl. VAT
Early-bird · held while subscribed
Excl. VAT
Early-bird · held while subscribed
For teams & organisations
Cancel anytime · Prices excl. VAT · VAT added at checkout by Stripe based on your country
| Free | Personal | Pro | Enterprise | |
|---|---|---|---|---|
| Ops per month Each atbridge action on your data — AI-provider calls in Chat aren't counted. | 20 (up to 1,000 in the trial) | 300 | Unlimited | Unlimited |
| Devices | 1 | 2 | 5 | 5 / seat |
| Email accounts | 1 (bound) | Unlimited | Unlimited | Unlimited |
| AI from your IDE / terminal | ✓ | ✓ | ✓ | ✓ |
| MCP (for AI agents) | ✓ (from budget) | ✓ (from budget) | ✓ | ✓ |
| ↳ atbridge Notes from outside Thunderbird (inside Thunderbird: every plan) | Trial only | ✓ | ✓ | ✓ |
| atbridge Branded Email | — | 10 / mo | Unlimited | Unlimited |
| Save your own templates | — | — | ✓ | ✓ |
| Per-item AI access levels | — | — | ✓ | ✓ |
| atbridge AI Chat (AI inside Thunderbird) | ✓ (standalone) | ✓ | Unlimited | Unlimited |
| ↳ docked (beside mail & notes) | — | ✓ | ✓ | ✓ |
| ↳ web search in chat | — | ✓ | ✓ | ✓ |
| ↳ files attached per request | 1 | Unlimited | Unlimited | Unlimited |
| ↳ voice typing (dictation) | — | — | ✓ | ✓ |
| Fast Actions (one-click AI: task / event / contact / reply) | Trial only | ✓ | ✓ | ✓ |
| Skills (/today, /clashes, /week …) | Trial only | ✓ | ✓ | ✓ |
| atbridge Notes editor (local notes workspace) | Basic | Full | Full | Full |
| Notes: voice notes + Plug-as-Context | — | — | ✓ | ✓ |
| Central management | — | — | — | ✓ |
| "Sent with atbridge" footer | Yes | No | No | No |
| Support | Community | Community | Priority email | Priority email |
An operation is one action atbridge makes on your data in Thunderbird — a search, send, reply, move, or a new event or contact. Talking to your AI provider in AI Chat (the model's thinking and its replies) is never counted — you pay your provider for that directly.
Just say what you need in plain language. A few ideas to try:
That's a taste — anything you can describe across your mailboxes, calendars and contacts is fair game. Browse the docs for the full picture →
No. atbridge.ai runs as a local process. Your AI talks to it over a localhost socket — not the public internet. We don't operate servers that touch your email. The only thing our servers do is verify your subscription.
Yes, measurably. Because atbridge.ai runs locally, a direct operation — reading a message, listing folders — completes in single-digit milliseconds — faster than the network round-trip a cloud tool pays before it even starts work. And because it returns plain text instead of full HTML by default, a typical fetch uses about 72% fewer tokens (~3.5× cheaper) with no unsolicited HTML.
One operation = one action that fetches or changes mail: a search, a list, a send, a reply, a forward, a move, a delete, a contact create/update. Follow-ups that don't fetch new data — opening a message you just listed, reading a thread you already pulled, viewing a contact you searched — do not count. Plan and bridge meta-commands never count.
No — the prices shown are exclusive of VAT. VAT is calculated and added at checkout based on your billing country. EU buyers will see their applicable rate applied automatically by Stripe. You'll see the final amount including VAT before completing payment.
Your trial is full Pro for 14 days or 1,000 operations, whichever comes first — during the trial every action on your mail, calendars, contacts and tasks counts, including opening an email. Afterwards you stay on Free: the CLI and MCP keep working with 20 operations per month, forever, and outbound mail gets a small "Sent with atbridge" footer. Upgrade anytime for more operations and no footer.
Early-bird pricing closed on Nov 1, 2026. Everyone who subscribed before then keeps €4.99 (Personal) or €9.99 (Pro) per month — held while subscribed, because Stripe never moves an existing subscription to a new price. New subscribers pay €7.99 (Personal) or €14.99 (Pro) per month, or less with annual billing.
Yes — switch the toggle above the plans to Annual. Annual billing works out to about two months free compared with paying monthly. Early-bird subscribers keep their monthly rate.
No. You install the atbridge add-on in Thunderbird from the .xpi file, then a setup wizard walks you through the rest — setting things up and connecting the AI of your choice, step by step. From then on you just talk to your assistant in plain language. No coding required.
Anything that can run a command or speak MCP: Claude Desktop, Claude Code, Cursor, Cline, Aider, Ollama, or your own agent. If it can run a shell command, it works.
Yes. Run atbridge.ai with Ollama and a local model — Qwen2.5-14b-instruct, Llama 3, Mistral and others work well. Your AI runs on your machine, so no email content goes to any AI provider — zero cloud AI, zero API keys. (Sending mail still uses your normal mail server, as always.) The trade-off is inference speed — it depends on your hardware. A modern Apple Silicon Mac or a fast GPU makes it practical for everyday use. This is the maximum-privacy configuration.
Our goal is to bring local AI email to as many people as possible, and Thunderbird gives us the widest reach to start: it's free, runs on every platform, works with any inbox via IMAP, and is the only mature email client that's genuinely extensible via open WebExtension APIs. That means one integration, any provider — Gmail, Outlook, iCloud, IMAP — for every user. We're always thinking about how to reach more people.
One machine you've activated your plan on. Free covers 1, Personal covers 2 (e.g. laptop + desktop), Pro covers 5. You can move your plan between machines from your account.
That's up to you. You can have it save everything as drafts for review, or let it send directly. Write access for agents is off by default and you opt in explicitly.
Yes, anytime, from the Stripe customer portal linked in your account. Your plan stays active until the end of the billing period.
Give your AI assistant the keys to your inbox — locally, privately, and faster than any cloud bridge.
Get started